Skip to main content

Machine Assembly

  • Install the CNC control
  • Install the M31
  • Install the base plate

image.png

image.png

 

  • Power on machine
  • Program VFD
  • Program Leadshine
  • Tensile mill specific setup
    • Align base plate
    • Calibrate tool setter
    • Calibrate Z zero and X and Y zero
  • Custom changes
    • DO NOT use temp licenses
  • Run machine 24 hours