Skip to main content

Micro Install Instructions

1. Unpack the Micro Mill

Remove the foil top cover over the crate and throw it away. Remove the clips in order and carefully remove the crate panels. Put all of the clips in a box so they don't get lost. The crate panels should go on a pallet so they can easily be moved around. Take the top one off first. Take off the layers of shrink wrap, keep the shiny bag and the plastic bag, cut the disposable strapping.

IMG20261015083417.jpg

IMG20261015083429.jpg

IMG20261014170224.jpg

Keep straps from the pallet over the base of the machine on, only cut the straps that go over the coolant tank. We will need to unpack the coolant tank enough to run the motor to verify that it works.

IMG20261014170148.jpg

Attach the M31 board here.

IMG20261014170207.jpg

Remove the small labels. We will need to pull the face plate and put an overlay on it. Take the buttons off and remove the screws, then put the screws back in the holes once the cover is off so that we don't lose the screws.

The ethernet cables are typically plugged in wrong. Verify that the loop starts at the M31 and ends at the VFD. The first cable in the chain on the right should start at the M31 board and go to the In port on the first drive, the second should go from the Out port to the In port on the second drive, the third should go from Out port to VFD.

17aa0d80-a8e9-4d27-bbfa-7f51b6cd7ee2.jpg

cf794fdd-86eb-40ff-b6c2-145ab0695f16.jpg

9fda2ff1-efc0-426c-8e96-80b3f6cc0e72.jpg

 

 

367a3654-79b3-4c07-9dbe-93faa941cbc8.jpg87219ca9-537e-46a1-a2a1-933265db7605.jpg