SOURCE MachPro Spindle Warm Up
MachPro has the ability to setup a Spindle Warm Up procedure for machines.
To be able to configure this go to Control->Plugins->MachMotion and then search for Spindle Warm Up.
Below is an example screen for the Spindle Warm Up settings.
| Parameter | Description |
| Spindle Warm Up Off Time Trigger in minutes |
How long do want the spindle to be off before the spindle will need to do the Warm Up cycle |
| Spindle Warm UP Acknowledge Warm-Up Complete | The operator will need to acknowledge that the warm up cycle completed |
| Spindle Warm Up Enabled | Warm Up Cycle On or Off |
| Spindle Warm Up Idle Speed | Speed the spindle will idle at after the warm up is complete. Some spindles will not go very slow and may idle at 1500 RPM |
| Spindle Warm Up Inter-Lock with Cycle Start | Yes or No |
| Spindle Warm Up MDI GCode Before Warm UP | Provides an MDI field to enter GCode that will run before the Warm Up cycle begins |
| Spindle War Up Max RPM | Max (finishing) speed for the warm up cycle. This should be the Max RPM of the spindle. |
| Spindle Warm Up Min RPM | Minimum (starting) speed for the warm up cycle (see note below) |
| Spindle Warm Up Steps | How many steps will it take to get the spindle up to Warmed Up status - from Minimum to Maximum RPM |
| Spindle Warm Up Time Per Step | How long it will stay in each Spindle Warm Up Step |
Specific values:
- Locate the manufacturer's warm up instructions. If none of your resources produces those instructions, then set 2 minutes at each step, and 6000 per step, ending 6000 below max spindle RPM.
- Calculate the correct parameters for your spindle
- For the Spindle Warm Up Min RPM, enter 1. It will start at the correct minimum RPM and do the steps and time as you specified.
If you need a max warm up RPM of 18000, and you need it to spend 2 minutes at 6000 and 12000 also, then set:
| Max RPM | 18000.0000 |
| Min RPM | 1.0000 |
| Steps | 3 |
| Time per step |
2.0000 |
18000/3 = 6000
